09 NCAC 06C .0205 COMPREHENSIVE EMERGENCY MANAGEMENT PLAN (CEMP)
(a) Each PSAP shall have a written Comprehensive Emergency Management Plan (CEMP) that includes:
(1) An emergency fire plan;
(2) A damage control plan; and
(3) A back-up PSAP plan that includes alternate 911 call routing conforming to 47 C.F.R. 20.18 and G.S. 62A-49.
(b) The PSAP shall test the plans in Paragraph (a) of this Rule and the CEMP at least once annually.
History Note: Authority G.S. 62A-42; 62A-46; 47 C.F.R. 20.18;
Eff. July 1, 2016.